Yesterday the workers were out bright and early to texture the walls. It was a goopy slippery mess on the floor yesterday evening, but it had dried by this morning. The masoner came out last night to measure the fireplaces for stone. Today the cleaning lady is coming out to vacuum all the dusty dried sheetrock so that the painters have a dust free environment to cover our walls with summertime paint. The interior doors and trim are being delivered today and installed some time this week. They'll be installed and caulked before the painters come back next week. I think the masoner will come back on the weekend to begin the fireplaces. The cabinets have already been built and will be installed sometime after the house is painted. Maybe next week, but possibly the week after. Once the cabinets are in, the countertops people come measure for the granite countertops. Then we have to wait at least 10 days for the countertops to be made.
Demolition is ever continuing. I feel as though it may be a terminal process. Of the trailer I would say that 2/3 of the roof is gone, 1/2 of the walls are gone, 2/5 of the sub floor is gone, and 1/3 of the chassis is gone. By this weekend I anticipate that most will be gone except for our bathroom which leaves at the last possible moment.
Filling up the wheelbarrow
A victorious yawp
Rich and Jim removing subflooring. The frame you see behind them is the outside of our living room and game room (aka bedroom).
Wheeling debris to the debris site. so heavy, Mom needs a little help from Joey
We have been getting some great sunset colors lately
Hall bathroom Kitchen
Living Room and door to utility room
Master bedroom
Media Room
1 comment:
We had a great time on Sunday. It was fun to be at the home building site and to actually help with the demo project. We love the location, the house and especially the front porch with the fireplace. The views are wonderful, and we are sure that Amanda and Rich will enjoy the house.