There is now no more existence of the trailer. We also knocked down a portion of the roof that was over the trailer. I put up insulation at the wall that the trailer used to share with the game room and living room. Then Rich and Steve and Linda helped put up the OSB and tar paper. We are not quite done with that, but hopefully will get to the siding this weekend. That is actually all we have to get done by the time we go to modify the loan. Actually at this point, I think there is finally more done than not done all the way around. The kitchen countertops are supposed to go in on Friday. We're really waiting on the septic to finish out the house. The septic engineer should be coming out this week to decide how and if we can modify our existing septic system. Until then we won't have any of the plumbing connected.